Task Manual Live Work - Gloving Lines

     

Pin / Post / suspension insulator change

STRAIN Insulator CHANGE

POLE / CROSSARM CHANGE

     

MAKING / BREAKING OF JUMPERS

ISOLATOR CHANGE

MIDSPAN AND JUMPER REPLACEMENT

     

OTHERS

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pin / Post / suspension ins change  BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

DMN_34-812

REPLACING INSULATORS ON INTERMEDIATE A-FRAME CONFIGURATIONS (GLOVING)

Changing glass / porcelain Pin insulators

NEW

 

Training and Assessment

Replace Pin / Post insulator on A-Frame using material handling Jib

Assessment

DMN_34-1107

CHANGING PIN/ POST INSULATORS ON VERTICAL AND STAGGERED VERTICAL STRUCTURES (GLOVING)

Changing Pin/ Post insulators where conductor weight is excessive

NEW

 

Training and Assessment

Changing Pin/ Post Insulators

SCSINAAX4

REPLACEMENT OF PIN INSULATORS (LIVE WORK)

Replacement task manual, read and sign

SCSINAAX9

REPLACEMENT OF POST INSULATORS (LIVE WORK)

DMN_34-2179

CHANGING PIN / POST / SUSPENSION INSULATORS ON HORISONTAL / DELTA / H-POLE / SCF / WISHBONE / KITE CONFIGURATION (GLOVING)

REPLACE GLASS / PORCELAIN PIN / SUSPENSION INSULATORS ON A BONDED CROSSARM

SCSINAAZ5

REPLACEMENT OF PIN INSULATORS ON INTERMEDIATE WOODEN STRUCTURES WITH UNEARTHED STEEL OR BONDED CROSSARMS

Training and Assessment

CHANGING PIN/ POST / SUSPENSION INSULATORS

 

SCSINAAX4

REPLACEMENT OF PIN INSULATORS (LIVE WORK)

Replacement task manual, read and sign

SCSINAAX9

REPLACEMENT OF POST INSULATORS (LIVE WORK)

SCSINAAX3

REPLACEMENT OF SUSPENSION INSULATORS( LIVE WORK)
REPLACE PIN / POST / SUSPENSION INSULATOR USING MATERIAL HANDLING JIB  

 

Assessment

STRAIN INS CHANGE   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

DMN_34-1108

CHANGING STRAIN INSULATORS ON VERTICAL STRUCTURES (GLOVING)

 

NEW

 

Replacement task manual, read and sign

DMN_34-2090

REPLACEMENT OF STRAIN INSULATORS ON A-FRAME CONFIGURATION (GLOVING)

 

 NEW

 

Replacement task manual, read and sign

DMN_34-2181

STRAIN INSULATOR CHANGE ON HORISONTAL / DELTA TYPE CROSSARM CONFIGURATIONS

 

SCSINAAX7

REPLACEMENT OF STRAIN INSULATORS (LIVE WORK)

Replacement task manual, read and sign

POLE / CROSSARM CHANGE   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

240-68940910

CHANGING AN INTERMEDIATE TO A STRAIN USING LIVE WORK GLOVING METHOD   NEW    

DMN_34-761

CHANGING POLE / SUSPENSION INSULATORS ON VERTICAL ANGLE STRUCTURES (GLOVING) Changing suspension insulators

DISINABD4

Replacing insulators on vertical angle suspension pole structure Replacement task manual, read and sign
Changing a pole

NEW

  Training and Assessment

DMN_34-808

CHANGING INTERMEDIATE POLES / CROSSARMS ON HORISONTAL / DELTA CONFIGURATIONS (GLOVING) CHANGING POLES USING RUBBER GLOVE AUX ARM

SCSINAAX8

REPLACEMENT OF HORIZONTAL OR DELTA CROSS-ARMS AND POLES (LIVE WORK) Training and / or Assessment
CHANGING POLES USING AUX LIFTING ARM

NEW

  Training and Assessment
CHANGING POLES USING TEMPORARY CONDUCTOR SUPPORTS

NEW

  Assessment

DMN_34-809

CHANGING / CONVERTING A WISHBONE SUSPENSION POLE USING TEMPORARY CONDUCTOR SUPPORTS

SCSINAAY0

POLE CHANGE AND CONVERSION OF A WISHBONE CONFIGURATION TO A STAGGERED DELTA (LIVE WORK) Training and / or Assessment
SUSPENDING CONDUCTORS ON INSULATED ROPES

NEW

  Training and Assessment
Using aux crossarms
  • MOUNTED ON POLE

NEW

  Training and / or Assessment
  • MOUNTED ON VMC

 

  Training and / or Assessment

DMN_34-1739

CHANGING 11KV AND 22KV WOODEN POLES WITH TRUCK MOUNTED INSULATING CROSSARM USING LIVE WORK METHODS       Training and / or Assessment

DMN_34-810

REPLACEMENT OF WISHBONE CROSS-ARMS (LIVE WORK)  

SCSINAAY1

REPLACEMENT OF WISHBONE CROSS-ARMS (LIVE WORK) Training and / or Assessment

DMN_34-1220

CHANGING INTERMEDIATE TO IN-LINE STRAIN POLE  (GLOVING)  

SCSINABC9

CHANGING AN INTERMEDIATE CONFIGURATION TO A STRAIN Assessment

240-45920887

REPLACEMENT OF A WOODEN INTERMEDIATE POLE WITH OR WITHOUT CROSS ARM ON A-FRAME CONFIGURATION (GLOVING)  

DMN_34-1222

  Replacement task manual, read and sign

DMN_34-1740

CHANGING INTERMEDIATE POLE / CROSSARM USING SPREADER BARS FROM GROUND LEVEL  

NEW

  Training and Assessment

DMN_34-1775

CHANGING SCF WOODEN POLE STRUCTURE TO A H POLE WOODEN STRUCTURE ON 11KV AND 22KV LINES  

NEW

  Training and Assessment

DMN_34-1991

CHANGING CROSS-ARMS ON SCF / H-POLE WOODEN POLE STRUCTURE ON 11KV AND 22KV LINES UTILISING APPROVED SPREADER BAR  

NEW

  Replacement task manual, read and sign

DMN_34-2038

CHANGING INTERMEDIATE POLES ON VERTICAL AND STAGGERED VERTICAL STRUCTURES (GLOVING) CHANGING INTERMEDIATE POLES USING TEMPORARY CONDUCTOR SUPPORT

NEW

  Training and / or Assessment
Training and Assessment
CHANGING INTERMEDIATE POLES USING MATERIAL HANDLING JIB OR SUPPORTING CONDUCTOR ON BUCKET

DMN_34-2173

REPLACEMENT OF SINGLE / DOUBLE WOOD POLE ON H-POLE CONFIGURATION (GLOVING  METHOD) REPLACEMENT OF A WOOD POLE (SUSPENSION AND IN LINE STRAIN) USING TENSIONING EQUIPMENT TO SUPPORT CROSSARM

NEW

  Training and Assessment
REPLACEMENT OF SINGLE OR BOTH POLES ON A H-POLE CONSTRUCTION (SUSPENSION AND IN LINE STRAIN) WITHOUT TENSIONING EQUIPMENT

NEW

  Training and Assessment
REPLACEMENT OF A WOODEN POLE (SUSPENSION AND IN LINE STRAIN) USING VMC TO SUPPORT CROSSARM

NEW

  Training and Assessment

DMN_34-2180

CONVERTING INTERMEDIATE TO STRAIN POLE ON HORISONTAL / DELTA / H-POLE / SCF CONFIGURATION  

NEW

  Training and Assessment

MAKING / BREAKING OF JUMPERS   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

DMN_34-1110

CONSTRUCTION OF A T-OFF / CUSTOMER CONNECTION FROM A VERTICAL STRUCTURE (GLOVING)

 

SCSINAAY2

TEE-OFF CONNECTIONS (LIVE WORK)

Replacement task manual, read and sign

DMN_34-1223

MAKING / BREAKING OF JUMPERS (GLOVING)

 

SCSINABD2

INSTALLING AND REPLACING POLE MOUNTED CIRCUIT BREAKER WITH EARTH FAULT PROTECTION ON MV NETWORK USING LIVE WORK METOD

Replacement task manual, read and sign

ISOLATOR CHANGE   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

DMN_34-806

INSTALLATION / MAINTENANCE OF DROPOUT FUSE LINK / GANGED ISOLATORS ON VERTICAL STRUCTURES (GLOVING)

 

SCSINAAX6

REPLACEMENT OF GANG-OPERATED ISOLATORS (LIVE WORK)

Replacement task manual, read and sign

DMN_34-807

MAINTENANCE OF CUTOUT FUSE LINK / GANGED ISOLATORS (IN-LINE STRAIN OR T-OFF USING GLOVING))

 

SCSINAAX5

REPLACEMENT OF CUT-OUT ISOLATORS (LIVEWORK)

Replacement task manual, read and sign

MIDSPAN AND JUMPER REPLACEMENT   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

DMN_34-1117

REPLACEMENT OF A FULL / NON-TENSION REPAIR SLEEVE/SPLICE (GLOVING)

REMOVING AND INSTALLING FULL TENSION JOINT

SCSINAAZ7

REPLACEMENT OF A PRE-FORMED REPAIR SPLICE (LIVE WORK)

Replacement task manual, read and sign

REMOVING AND INSTALLING NON TENSION JOINT

NEW

 

Replacement task manual, read and sign 

DMN_34-2227

REPLACING A SECTION OF CONDUCTOR (GLOVING)       Replacement task manual, read and sign

OTHERS   BACK to top

Unique ID

Description

Detailed Description

Old Unique ID

Description

recommended action

240-61181702 LINES LIVE WORK CROSSING OVER 11 KV TO 33 KV ENERGIZED LINES     LINES LIVE WORK CROSSING OVER 11 KV TO 33 KV ENERGIZED LINES  

DMN_34-760

INSTALLING AND REPLACING POLYMERIC SURGE ARRESTORS ON MV NETWORK (GLOVING)

 

INSTALLING POLYMERIC SURGE ARRESTORS

DISINABD3

INSTALLING AND REPLACING POLYMERIC SURGE ARRESTORS ON MV NETWORK, USING LIVE WORK METHOD

Replacement task manual, read and sign

REMOVING POLYMERIC SURGE ARRESTORS

 

 

Replacement task manual, read and sign

DMN_34-789

INSTALLATION OF BIRD FLAPPERS / FAULT LOCATORS / ALARMS (GLOVING AND STICK METHOD)

 

 

 

SCSINAAZ4

INSTALLATION OF BIRD FLAPPERS (LIVE WORK)

Replacement task manual, read and sign

 

DISINABE8

INSTALLATION OF ALARMS ON MV LINES USING LIVE WORK METHODS

Replacement task manual, read and sign

 

DISINABF0

INSTALLATION OF ALARMS ON HV LINES USING LIVE WORK METHODS

Replacement task manual, read and sign

DMN_34-798

INSTALLATION / REPLACEMENT OF STAY INSULATORS (GLOVING)

 

DISINABG8

REPLACING STAY WIRES ON WOODEN POLE STRUCTURES, USING LIVE WORK GLOVING METHOD

Replacement task manual, read and sign

DMN_34-1116

PREPARATION OF THE PIGGYBACK SYSTEM FOR LIVEWORK MAINTENANCE (LIVEWORK)

 

SCSINAAZ6

PREPARATION OF THE PIGGYBACK SYSTEM FOR LIVE WORK MAINTENANCE (LIVE WORK)

Replacement task manual, read and sign

DMN_34-1219

CUTTING AND REMOVING A SECTION OF DOWN-RUNNING EARTHWIRE ON WOOD POLE STRUCTURE TO INCREASE THE B.I.L. (GLOVING)

 

SCSINABC8

CUTTING AND REMOVING A SECTION OF DOWN-RUNNING EARTHWIRE ON WOOD POLE STRUCTURE TO INCREASE THE B.I.L. USING LIVE WORK GLOVING METHOD.

Replacement task manual, read and sign

DMN_34-1221

PRUNING OF TREES (GLOVING)

 

SCSINABD0

PRUNING OF TREES, USING LIVE WORK GLOVING METHOD

Replacement task manual, read and sign

DMN_34-1810

SPRAY WASHING OF INSULATORS ON ENERGISED APPARATUS FROM 11 KV TO 132 KV USING LIVE WORK METHODS

 

DWN0010

SPRAY WASHING OF INSULATROS ON ENERGISED APPARATUS FROM 11KV TO 132KV, USING LIVE WORK METHODS

Replacement task manual, read and sign

 Last reviewed for relevance on 14/02/17
*formal content*